Temporary water transfer
That's what water transfer runs on. Get those two right and the rest falls into place. We move water for a living, and the details are where these jobs are won: the route your crew captured, the pipe that's actually on the truck, pumps sized to the line they're pushing. TDH Engine is the hydraulic design software that holds all of it, and when the scope changes the design keeps up.
It's what we use on our own work. You're welcome to it.
Every one of these is a detail that decides how a job goes. They're our specialty.
The head belongs to the ground you're actually on, not to a tidy version of it on a map. That's where every one of our designs starts.
A real route has bends, crossings, and the stretch that goes the long way round because the short way was fenced. Your crew already knows it. That's the line we design on.
Pumps work as a set, not one at a time. Where you put one changes what the others are doing, and keeping that straight is the detail that decides a run.
Lay-flat, steel, whatever the job calls for. The pipe on the truck is what the job runs on, so that's what the design runs on.
The source moves. A landowner points you somewhere else. That's a small edit, not a rewrite.
You looked at two ways and picked one. The other one stays, with the numbers it came out at, for the day somebody asks.
Produced water behaves differently in a line, and it's treated that way from the start. What's in the pipe is part of the job, the same way the route is.
These are the jobs we get called out on. If yours looks like one of these, you'll be right at home.
Source to pad, down lease roads that don't care what the map says.
Treatment plants, lift stations, and the transfer lines that feed them.
Cooling loops, process water, and moving it around inside a plant.
Supply networks laid across ground that never cooperates.
The route is the hard part in every one of them.
Lead scenario
A long lay-flat run from the point of diversion out to a multi-well pad. The lease road decides where that line goes, and the highway crossing partway along is the one everybody plans around.
A transfer line feeding a facility on somebody else's schedule. The pumps have to be spoken for before the week you need them, so the sizing question lands while there's still iron left to book.
A supply run where the ground climbs the whole way there. What that climb costs you comes off the ground your crew captured, not off a straight line on a map.
Transfer inside a plant, where both ends are welded in place already. The route is fixed, so the line itself decides the answer, right down to what's flowing through it.
Tell us what's on the ground. We've run into something like it before, and where we haven't, we want to.
Contact SalesPick whoever fits best and it goes straight to them.